DUNGS VPS 504 S04 PDF

VPS S04 VAC () by Dungs | DUNGS, VPS VALVE PROVING SYSTEMS, VAC | Valves | Shipping to + countries worldwide. Technical description. The VPS S04 is the valve proving system for DUNGS multiple actuators. The valve proving system complies with EN Equipment . Find great deals for VPS S04 Dungs Burner Valve Testing System for Multiple Actuators Max. Shop with confidence on eBay!.

Author: Dut Mikataxe
Country: Seychelles
Language: English (Spanish)
Genre: Literature
Published (Last): 15 January 2016
Pages: 131
PDF File Size: 19.15 Mb
ePub File Size: 5.74 Mb
ISBN: 464-5-14533-947-9
Downloads: 50377
Price: Free* [*Free Regsitration Required]
Uploader: Yozshulrajas

Accessories Manuals Datasheets Certificates.

GasMultiBloc MBsolenoid valvesdouble solenoid valvespressure switchesvalve proving systemspressure regulatorsgas and air filtersmotorised valves, actuatorsball valvesautomatic burner controlsGB GasBlocaccessories. MV – 1 bar, one-stage N. ZR – two-stage, N. HSAV – semi-automatic N.

VPS 504: Valve proving system for multifunctional gas controls

LGV – mbar N. LV-D – air valve N. HFSV – butterfly valve N. SV – mbar N. AV – 6 bar, one-stage N.

  ATRAVESSANDO RUA RICHARD SIMONETTI PDF

VR – mbar N. VPS Dungs – valve proving system for multifunctional gas controls These valve proving systems VPS may be used with any other valve whose tightness in counter-flow direction excludes by construction a leakage in flow direction. Equipment operates independent of residual pressure in the range of the permissible operating range.

Tightness or leaks are dungz by a LED.

S044 for TRD systems. Electrical connection possible by plug connection for S01, S02 and S No rewiring is required for contact allocation as per DIN S04 and S05 have an electrical connection at screw terminals fungs PG Suitable for gases of gas families 1, 2, 3 and other neutral gaseous media.

Program sequence Idle state: Valves 1 and 2 are closed. The internal motor pump increases the gas pressure in the test section by approx. During the test period, the installed differential pressure switch monitors the test section for leakage.

If the test pressure is attained, the motor pump is switched off end of test period. The release time s depends on the test volume max 4 l and input pressure max. If the test section is tight, the contact is released to the automatic burner control after max.

  LINGASHTAKAM LYRICS IN ENGLISH PDF

The red signal lamp lights as long as the contact release by the regulator of thermostat is present heat requirement.

VPS Valve proving system for multifunctional gas controls – DUNGSĀ® Combustion Controls

If there is a short power failure during the test or burner operation, the test is started again automatically. The internal valve of the VPS is closed. Test volume of Dungs multiple actuators: